Death Stranding Order 10: Building Construction Bridge Guide

Order 10 of Death Stranding is yet again another mission that explains the basics of the gameplay systems, in this case, the construction of bridges. In this guide, we will tell you how to complete Order 10: Building Construction Bridge so sit back and relax.

Order 10 is part of the game’s 2nd Episode, where players are tasked with connecting Port Knot City to the Chiral Network.

Death Stranding Order 10 Construction Bridge

There are two main methods of completing this mission:

  1. By constructing the whole bridge yourself.
  2. By starting the construction and let other players complete the construction.

In the Death Stranding, many of the objects have shared access with other players for obtaining materials for their construction. This bridge also holds the same criteria. Either you can complete it all on your own, or you can start the construction and the other players can help you construct the bridge by donating the required pieces of metals. You can get the required amount of metal from the Mules just south of the Distribution Center.

Building bridges is extremely helpful in later stages of the game as well as it lets you cross larger bodies of water with ease. Provided you have the materials, it is always nice to have some bridges built around to not only help you but other players as well.

So if you do not have enough pieces of metals, or you don’t want to utilize your loot over it, follow the 2nd method. Else, follow the first one. Both are described as under:

Method 1 (Constructing Alone)
From the Distribution Center West of Capital Knot, go outside and take the sharp west path. Head towards the designated spot which is along the river bank.

You will see a construction site here, and a PCC around. Interact with the PCC to start the construction of the bridge. If you have 200 metal pieces with you, donate them here and the bridge will be constructed.

Method 2(Constructing in a shared way)
From the Distribution Center West of Capital Knot, go outside and take the sharp west path. Head towards the designated spot which is along the river bank.

You will see a construction site here, and a PCC around. Interact with the PCC to start the construction of the bridge.

Start the construction by interacting with the PCC and then without donating all the pieces of metals, just wait for other players to do it for you. Once completed, your Bridge will be automatically constructed and your mission will be automatically checked as ‘Passed’

Contributor at SegmentNext.